Wed 2 Sep 2026
FTSE 100 10,756.45 -1.19%Microsoft 496.82 +0.09%NVIDIA 224.41 +7.04%Apple 324.96 +3.67%Google 333.78 -1.57%S&P 500 7,666.60 -0.12%Nasdaq 26,217.83 +0.34%Dow 53,061.95 -0.75%Russell 2000 2,953.17 -1.75%US 10Y Treasury 4.80% +2.65%Euro Stoxx 50 6,362.15 -0.97%DAX 25,839.33 -1.70%AEX-Index 1,103.67 +0.03%Nikkei 225 64,325.64 -2.73%Hang Seng 25,311.21 -1.33%Gold $4,435.60 -0.95%Silver $65.99 -1.50%Brent Crude Oil $95.35 +6.76%Natural Gas $3.00 +3.84%Copper $6.61 +0.67%GBP/USD 1.3482 -0.85%GBP/EUR 1.1631 -0.27%GBP/AUD 1.8807 -0.66%Bitcoin (USD) $77,043 -1.54%Ethereum (USD) $2,382 -3.09%FTSE 100 10,756.45 -1.19%Microsoft 496.82 +0.09%NVIDIA 224.41 +7.04%Apple 324.96 +3.67%Google 333.78 -1.57%S&P 500 7,666.60 -0.12%Nasdaq 26,217.83 +0.34%Dow 53,061.95 -0.75%Russell 2000 2,953.17 -1.75%US 10Y Treasury 4.80% +2.65%Euro Stoxx 50 6,362.15 -0.97%DAX 25,839.33 -1.70%AEX-Index 1,103.67 +0.03%Nikkei 225 64,325.64 -2.73%Hang Seng 25,311.21 -1.33%Gold $4,435.60 -0.95%Silver $65.99 -1.50%Brent Crude Oil $95.35 +6.76%Natural Gas $3.00 +3.84%Copper $6.61 +0.67%GBP/USD 1.3482 -0.85%GBP/EUR 1.1631 -0.27%GBP/AUD 1.8807 -0.66%Bitcoin (USD) $77,043 -1.54%Ethereum (USD) $2,382 -3.09%
Markets
Advertisement
Follow News in 60 on Facebook
UK Weather
London 18°C CloudyBirmingham 17°C OvercastManchester 16°C Patchy rain nearbyNewcastle 17°C Patchy rain nearbyBristol 18°C Patchy rain nearbyPembroke 18°C Patchy rain nearbyEdinburgh 14°C Light drizzleBelfast 17°C Patchy rain nearbyInverness 11°C Patchy rain nearbyPenzance 18°C Patchy rain nearbyHolyhead 17°C Light rain showerNorwich 18°C Overcast
More Info

Concerns Rise as Goldmine Project Resumes in Guatemala

Advertisement
Follow News in 60 on Facebook

The revival of the Era Dorada goldmine project in Guatemala has reignited fears among local residents about water scarcity and environmental degradation. After years of inactivity, the Canadian company Aura Minerals has resumed operations, prompting villagers to voice concerns that history is repeating itself. Residents like Elda Dinora Ramírez report that their wells are drying up again, a situation they attribute to the mine’s water extraction practices.

The project, which has faced significant opposition over the years, is now set to produce an estimated 111,000 ounces of gold annually. While Aura Minerals claims to be implementing sustainable practices, including a closed-loop water system, local activists remain skeptical. They argue that the environmental safeguards in place are inadequate and fear that the mine will exacerbate existing water shortages.

As the construction progresses, the community is already experiencing negative impacts, with reports of reduced harvests and livestock health issues linked to dust from the site. The situation highlights a critical tension between economic development and environmental sustainability, raising questions about the long-term viability of such projects in water-scarce regions.

The ongoing developments at Era Dorada serve as a reminder of the complex interplay between mining activities and local ecosystems. As residents brace for potential consequences, the future of their water supply hangs in the balance, underscoring the urgent need for comprehensive environmental oversight in mining operations.

Source: The Guardian

Read more World news →

Leave a comment

Your email address will not be published. Required fields are marked *