Wed 16 Sep 2026
FTSE 100 10,691.66 +0.20%Microsoft 497.12 +0.64%NVIDIA 212.17 -6.01%Apple 331.34 +4.78%Google 341.43 +1.80%S&P 500 7,585.73 -1.14%Nasdaq 25,981.57 -1.66%Dow 52,093.11 -1.31%Russell 2000 2,870.29 -3.04%US 10Y Treasury 5.00% +3.29%Euro Stoxx 50 6,253.83 -0.24%DAX 25,402.50 -0.68%AEX-Index 1,097.37 +0.38%Nikkei 225 63,923.00 -2.07%Hang Seng 24,708.40 -2.24%Gold $4,365.40 -0.99%Silver $64.95 +0.61%Brent Crude Oil $108.08 +3.32%Natural Gas $2.90 +2.51%Copper $6.48 +0.17%GBP/USD 1.3474 -0.58%GBP/EUR 1.1662 +0.14%GBP/AUD 1.8898 +0.72%Bitcoin (USD) $75,507 -2.28%Ethereum (USD) $2,391 -5.34%FTSE 100 10,691.66 +0.20%Microsoft 497.12 +0.64%NVIDIA 212.17 -6.01%Apple 331.34 +4.78%Google 341.43 +1.80%S&P 500 7,585.73 -1.14%Nasdaq 25,981.57 -1.66%Dow 52,093.11 -1.31%Russell 2000 2,870.29 -3.04%US 10Y Treasury 5.00% +3.29%Euro Stoxx 50 6,253.83 -0.24%DAX 25,402.50 -0.68%AEX-Index 1,097.37 +0.38%Nikkei 225 63,923.00 -2.07%Hang Seng 24,708.40 -2.24%Gold $4,365.40 -0.99%Silver $64.95 +0.61%Brent Crude Oil $108.08 +3.32%Natural Gas $2.90 +2.51%Copper $6.48 +0.17%GBP/USD 1.3474 -0.58%GBP/EUR 1.1662 +0.14%GBP/AUD 1.8898 +0.72%Bitcoin (USD) $75,507 -2.28%Ethereum (USD) $2,391 -5.34%
Markets
Advertisement
Follow News in 60 on Facebook
UK Weather
London 15°C SunnyBirmingham 13°C OvercastManchester 14°C Patchy rain nearbyNewcastle 13°C Patchy rain nearbyBristol 14°C SunnyPembroke 14°C Patchy rain nearbyEdinburgh 12°C Patchy rain nearbyBelfast 12°C Patchy rain nearbyInverness 10°C Patchy rain nearbyPenzance 15°C Patchy rain nearbyHolyhead 14°C Patchy rain nearbyNorwich 15°C Partly Cloudy
More Info

Funding Secured to Reopen Cumbrian Rail Tunnel and Address Water Contamination

Advertisement
Follow News in 60 on Facebook

Network Rail has announced a £60 million funding plan to reopen the Bransty rail tunnel on the Cumbrian Coast Line, which has been closed since July 2025 due to structural issues. This initiative aims to not only restore rail services but also tackle the ongoing problem of discoloured water flowing into Whitehaven’s Queens Dock.

The contaminated water, which has been a concern since 2022, is caused by iron ochre draining from the tunnel. The proposed solution includes a permanent water filtration system and filling in old mine workings beneath the track. Local MP Josh MacAlister has hailed this as a significant breakthrough for the area.

Network Rail is currently working with environmental agencies to secure the necessary approvals before commencing work. The reopening of the tunnel is expected to alleviate the reliance on replacement bus services for passengers travelling to Sellafield.

This project not only promises to enhance local transport infrastructure but also aims to improve the environmental quality of the harbour, addressing both rail connectivity and water safety in one comprehensive plan.

Source: BBC News

Read more Money news →

Leave a comment

Your email address will not be published. Required fields are marked *